The New Energy Generation Capacity of Jilin Oilfield Has Exceeded 100 Million KWH

news_banner
The New Energy Generation Capacity of Jilin Oilfield Has Exceeded 100 Million KWH

2023-06-01

The New Energy Generation Capacity of Jilin Oilfield Has Exceeded 100 Million KWH


By the "green" forward to seek transformation, "billion" from the "scenery" to the future. According to the summary report of New Energy Division of Jilin Oilfield, as of midnight on May 26, the new energy generation of Jilin Oilfield exceeded 100 million KWH. According to statistics, green electricity replacement has accumulated more than 40 million yuan, reducing carbon emissions by nearly 80,000 tons.

Seizing the national "double-carbon" opportunity, Jilin Oilfield takes the new energy business field as the "oil path" for the transformation and development, accelerates the construction of green and low-carbon new oil fields, and realizes the low-carbon transformation and high-quality development of the old oil fields. Jilin Oilfield seized the opportunity of the launch of the "Onshore scenery Three Gorges" Project in Jilin Province, gave full play to the advantages of CNPC upstream and downstream coordination and resource facilities, and vigorously developed the landscape power generation business by means of self-consumption, gas and electricity peak regulation and green electricity hydrogen production.

At present, all the power generation targets of 2 million kw projects have been obtained. Among them, the 150,000 kW self-absorbed project is put into operation to the grid, with an annual generating capacity of 360 million degrees, which can realize the clean replacement of 1 / 4 of the whole oil field; the 550,000 kW wind power project is anchored at the end of the year, and the "inverted schedule and wall chart operation" is adopted to promote the project, and it is accelerating.


0