Huabei Oilfield Forms a "Double Channel"

news_banner
Huabei Oilfield Forms a "Double Channel"

2023-08-17

Huabei Oilfield Forms a "Double Channel"


On August 11, with the CBM from the Mabi cooperation block successfully arriving at the Qinshui gas transmission station on the first line of the National Pipeline Network Group, the second pipeline from Shanxi Qinshui CBM field to the national backbone pipeline network was successfully completed, increasing the external pipeline transmission capacity of 1.5 billion cubic meters annually. As of August 15, the pipeline remained running smoothly. So far, the external transmission capacity of jinnan CBM pipeline in Huabei Oilfield has reached 3.5 billion cubic meters per year, adding a new guarantee for the winter supply of Beijing, Tianjin, Hebei, Henan, Shandong, Jiangsu and other regions.

Shanxi Qinshui coalbed methane field of Huabei Oilfield is the largest CBM field in China. Part of the gas is transported through the first line of west-east gas transmission, which is an important gas source in Shanxi Province, Beijing-Tianjin-Hebei region, Henan, Shandong and Jiangsu region. To further release my coalbed methane field production capacity, combined with CBM development planning, huabei oilfield advance planning, started in early 2020 ma will block to west-east gas my gas station loading project, strive to break the production and marketing bottleneck, form a new pattern of "double channel" outside, ensure the CBM production full pin, back unobstructed.

Huabei Oilfield Sales Division, Shanxi CBM Branch company and other departments and units have set up special work classes, developed ideas, communicated and communicated for many times, and put forward adjustment plans. After 4 rounds of data reporting and review, it was approved and uploaded by the National Pipeline Network Group in April 2023.

Gas transmission channel through a day through, winter supply can be more peace of mind. The Sales Department of Huabei Oilfield and Shanxi CBM Branch formulated plans, and cooperated with the West-east Gas Transmission Branch of National Pipeline Network Group adhering to the concept of "one family, one game of chess", coordinated and cooperated. All the staff will transform the theme education learning results into the motivation of the secretary, to start a business. The leading cadres are stationed at the site, and the participants will overcome the adverse conditions such as high temperature and continuous rainfall in flood season, reverse the schedule, and carry out wall chart operations. After 19 days of hard work, the pipeline was connected on August 10.

The Mabcooperation block project is a foreign cooperation project of Huabei Oilfield. At present, the daily gas output of the project has increased to more than 1.6 million cubic meters. The completion ventilation of the external pipeline of the project will effectively reduce the pressure production and emptying situation, accelerate the benefit transformation of the block, and provide a model for the coordinated development of the upstream and downstream of CBM.


0