Sales Department: 0086-532-87605018
After-sale Service: 0086-532-87660287
E-mail: export_sales@haitongyuanda.com
2023-11-30
The Annual Green Electricity of Liaohe Oilfield Exceeds 100 Million KWH
As of November 22, Liaohe Oilfield's new energy generation this year reached 100.8 billion KWH, the first annual green electricity exceeded the 100 million KWH mark, the total amount of clean power converted to 21,400 tons of standard oil, converted to about 77,000 tons of carbon dioxide emission reduction.
At present, Liaohe oilfield's new energy power generation is mainly photovoltaic power generation projects. There are 11 solar power generation projects in the oil region, of which 10 are distributed photovoltaic power generation projects. The total installed capacity of solar power generation projects is 96.03 MW, and the annual power generation is expected to reach 106 million KWH.
Liaohe Oilfield photovoltaic power generation project makes full use of well sites, stations and idle land resources for construction. Up to now, a total of 1350 distributed photovoltaic power generation points have been built in the oil field. These green electricity is directly supplied to oil and gas production facilities in oil fields, and basically realizes self-use.
Since the beginning of this year, Liaohe Oilfield has closely focused on the overall deployment of the Group company's three steps of "clean substitution, strategic replacement and green transformation", adhered to the development strategy of "equal emphasis on oil and gas and new energy", set up specialized business classes, and adhered to the integrated and coordinated development of upstream and downstream. The company led the team to communicate with the local government of Liaoning Province, refining and chemical enterprises, head enterprises, etc., and determined the six cities of Liaoyang, Fushun, Dalian, Panjin, Jinzhou and Chaoyang as key areas to obtain green electricity indicators, and has obtained 600,000 kilowatts of indicators to be issued.